Explore every episode of the podcast General Energy Markets Training
| Title | Pub. Date | Duration | |
|---|---|---|---|
| Powering Reliability Through Market Design | 08 mai 2026 | 00:22:25 | |
PJMPowering Reliability Through Market Design | |||
| Illinois Renewable Energy Access Plan | 19 avr. 2026 | 00:13:15 | |
REAP - Illinois | |||
| Resource Adequacy Study | 19 avr. 2026 | 00:14:02 | |
Illinois Resource Adequacy Study (IPA, IEPA, ICC) | |||
| CRGA Utility Scale Battery Procurement | 29 mars 2026 | 00:19:39 | |
Energy Storage Procurement Report to the Governor, the General Assembly, and the Illinois Commerce Commission | |||
| ComEd Long-Range Strategy | 19 mars 2026 | 00:22:18 | |
ComEd Long-Range Strategy Connecting Our Customers to Tomorrow | |||
| 15 Year Power Grid Master Plan | 19 mars 2026 | 00:19:40 | |
PJM Manual 14B - PJM Region Transmission Planning Process | |||
| Preventing Grid Collapse Through Transmission Operations | 02 mars 2026 | 00:15:16 | |
PJM Manual 03 - Transmission Operations | |||
| Energy Efficiency in PJM | 02 mars 2026 | 00:19:51 | |
PJM Manual 18b Energy Efficiency Measurement & Verification | |||
| IL Integrated Resource Planning | 02 mars 2026 | 00:44:36 | |
ICC IRP and Resource Adequacy | |||
| Advance Metering | 13 févr. 2026 | 00:19:01 | |
DOE Advanced Metering Infrastructure and Customer Systems | |||
| FERC 2222 | 12 févr. 2026 | 00:15:51 | |
FERC 2222 language | |||
| Turning Grid Physics Into Capacity Revenue | 11 févr. 2026 | 00:15:37 | |
PJM Manual 21B Rules and Procedures for Determination ofGenerating Capability | |||
| How PJM Manual 15 Stops Price Gouging | 10 févr. 2026 | 00:16:12 | |
PJM Manual 15 Cost Development Guidelines | |||
| Autopsy of PJM ELCC Manual 21A | 10 févr. 2026 | 00:14:45 | |
PJM Manual 21A Determination of Accredited UCAP UsingEffective Load Carrying Capability Analysis | |||
| Illinois Blueprint for Nuclear and Electric Vehicles | 10 févr. 2026 | 00:33:34 | |
CRGA Language Extended | |||
| The math behind a blackout | 10 févr. 2026 | 00:18:03 | |
PJM Manual 20A Resource Adequacy | |||
| Forecasting Unrestricted Load | 10 févr. 2026 | 00:13:57 | |
PJM Manual 19 Load Forecasting | |||
| Building Gas Plants to Save Clean Energy | 07 févr. 2026 | 00:15:21 | |
ICC Final Resource Adequacy Study Released | |||
| Buying_Grid_Reliability_Three_Years_Early | 06 févr. 2026 | 00:17:10 | |
PJM Manual 18 Capacity Market | |||
| PJM Energy and Ancillary Services Market Operations | 06 févr. 2026 | 00:19:01 | |
PJM Manual 11Energy and Ancillary Services Market Operations Manual | |||
| PJM_Financial Transmission Rights and Auction Revenue Rights | 06 févr. 2026 | 00:18:32 | |
PJM Manual 06 Financial Transmission Rights and Auction Revenue Rights | |||