Detailed: An original podcast by ARCAT – Détails, épisodes et analyse

Détails du podcast

Informations techniques et générales issues du flux RSS du podcast.

Detailed: An original podcast by ARCAT

Detailed: An original podcast by ARCAT

ARCAT // Gābl Media

Arts
Business
Education

Fréquence : 1 épisode/7j. Total Éps: 186

Captivate
Along the process of design and construction, incredible stories of conflict and triumph emerge in pursuit of the broad vision for a building. Detailed is a series that features architects, engineers, builders, and manufacturers who share their insight and expertise as they highlight some of the most complex, interesting, and oddest building conditions that they have encountered, and the ingenuity it took to solve them. Join host, Cherise Lakeside, aka CSI Kraken, a Senior Specification Writer at RDH Building Science, as she uncovers lessons learned to help you navigate similar challenges that may arise in your next project.
Site
RSS
Apple

Classements récents

Dernières positions dans les classements Apple Podcasts et Spotify.

Apple Podcasts

  • 🇺🇸 États-Unis - design

    31/07/2025
    #100
  • 🇺🇸 États-Unis - design

    28/07/2025
    #94
  • 🇺🇸 États-Unis - design

    27/07/2025
    #59
  • 🇺🇸 États-Unis - design

    26/07/2025
    #41
  • 🇺🇸 États-Unis - design

    25/07/2025
    #32
  • 🇺🇸 États-Unis - design

    24/07/2025
    #23
  • 🇺🇸 États-Unis - design

    23/07/2025
    #21
  • 🇺🇸 États-Unis - design

    22/07/2025
    #22
  • 🇺🇸 États-Unis - design

    21/07/2025
    #26
  • 🇺🇸 États-Unis - design

    20/07/2025
    #30

Spotify

    Aucun classement récent disponible



Qualité et score du flux RSS

Évaluation technique de la qualité et de la structure du flux RSS.

See all
Qualité du flux RSS
À améliorer

Score global : 68%


Historique des publications

Répartition mensuelle des publications d'épisodes au fil des années.

Episodes published by month in

Derniers épisodes publiés

Liste des épisodes récents, avec titres, durées et descriptions.

See all

105: Feng Shui | Zen Modern Residence

Saison 8 · Épisode 105

samedi 7 septembre 2024Durée 41:25

In this episode, Cherise is joined by Marcos Santa Ana, licensed Architect, General Contractor, and high-performance building designer. Marcos founded Alloi (alloy), a Los Angeles-based architect-led design-build firm.

The Zen Modern Residence, a 2,650-square-foot home, seamlessly merges poetry and pragmatics. Originally a traditional 1,650-square-foot house, it underwent a thoughtful transformation, resulting in a stunning two-story home. True to its name, the Zen Modern Residence incorporates Feng Shui principles to promote harmony and tranquility.

If you enjoy this episode, visit arcat.com/podcast for more.

If you're a frequent listener of Detailed, you might enjoy similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

LIVE From AIA 2024 with Total Security Solutions

Saison 7

mercredi 4 septembre 2024Durée 23:24

In this bonus episode of Detailed, we share a LIVE conversation from the 2024 AIA Conference on Architecture & Design in Washington D.C.

Cherise is joined by Paul La Vigne, Chief Marketing Officer at Total Security Solutions. Paul details how Total Security Solutions' designs, installations, and manufactured products are crucial in stopping bullets, thereby saving and protecting lives, facilities, and property.

If you enjoy this episode, visit arcat.com/podcast for more.

If you're a frequent listener of Detailed, you might enjoy similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

LIVE From AIA 2024 with Maxxon

Saison 7

mercredi 31 juillet 2024Durée 19:26

In this bonus episode of Detailed, we share a LIVE conversation from the 2024 AIA Conference on Architecture & Design in Washington D.C.

Cherise is joined by Mike Emmert, Commercial Sales and Technical Representative of the North East Region at Maxxon. Mike details the sound control systems, underlayments, and concrete-slab space solutions Maxxon implements in commercial and multifamily construction projects.

If you enjoy this episode, visit arcat.com/podcast for more.

If you're a frequent listener of Detailed, you might enjoy similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

34: CLT Roof | PDX Terminal Core, Part I

Saison 4 · Épisode 34

vendredi 18 novembre 2022Durée 32:41

In this episode, Cherise is joined by Steve Clem, Senior Vice President Project Planning at Skanska USA Building. Steve shares his experience as the contractor on TCORE, the PDX airport Terminal Core redevelopment project, in Portland, Oregon. The project, which is under construction at the time of this recording, is a complete reimagining of the main terminal building including comprehensive changes to ticketing, security and concessions.

The new roofing system over the entire terminal core complex will span six football fields and showcase a wood and glass roof that fills the airport with light. The building is designed for peak sustainability with daylighting, optimized mechanical components, and an efficient envelope—but it also extends the concept of sustainability to the seven-year project’s potential to have a positive impact on helping sustain the local economy. To see project photos and details discussed, visit arcat.com/podcast

This project has unique challenges and opportunities - the construction is on a fully operational and occupied building that is only closed for a few hours overnight, prefabrication near the site was key to work within limited project site construction hours, the team has to acquire a temporary certificate of occupancy EVERYDAY during the roof assembly in order for the airport to be operational the next morning, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

33: Restoration | The Tin Building

Saison 4 · Épisode 33

vendredi 11 novembre 2022Durée 01:04:12

In this episode, Cherise is joined by Christian Giordano, President & Co-owner at Mancini Duffy and Jessica Sheridan, AIA, Principal at Mancini Duffy. Christian and Jessica share insights into their experience as architect of record for The Tin Building, 96 South Street in New York City, New York, designed by SHoP Architects. Set under the shadow of the Brooklyn Bridge, the two-story building offers an unexpected array of culinary experiences designed to delight and engage the senses –including multiple restaurants with open kitchens, innovative retail concepts, and an impeccably stocked central market.

Originally built in 1907 as the center of the Fulton Fish Market, the Tin Building is a landmarked structure within a landmarked neighborhood. Mancini, as architect of record, facilitated the move of the building 33 feet to the east—disassembling the historic structure and reassembling it at its new location—while also elevating it 6 feet so it would be above the 100-year flood plain. To see project photos and details discussed, visit arcat.com/podcast

This project provided unique challenges and opportunities - raising and relocating a 100+ year old historic building, the challenge of equally highlighting both historic and new architectural elements, coordinating extensive kitchen mechanical systems to provide a thoughtful and aesthetically pleasing design of rooftop equipment and penetrations, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

32: TFP Isolator | Samuel Oschin Air and Space Center

Saison 4 · Épisode 32

vendredi 4 novembre 2022Durée 42:03

In this episode, Cherise is joined by Brian Kenworthy, Design Principal at ZGF Architects based in ZGF’s Los Angeles office. Brian shares insights into his work on the California Science Center, Samuel Oschin Air and Space Center in Los Angeles, California. As the permanent home of Endeavour—one of America’s most priceless artifacts—California Science Center’s 200,000 SF Samuel Oschin Air and Space Center will be a symbol of American ingenuity and its renowned legacy of space exploration.

Characterized by a curvilinear design of exterior forms clad in stainless steel, the new addition’s architectural expression is inspired by the aerodynamic, fluid geometry of the Endeavour’s fuselage, cockpit, wings, and vertical stabilizer. The primary structure will be three stories, while the shuttle gallery will rise six stories—peaking at 200 feet - to accommodate the height of the Endeavour in launch position. To see project photos and details discussed, visit arcat.com/podcast

Amie Nulman, Associate Principal of Building Structures at ARUP, Los Angeles, provides additional insight as the lead structural engineer and project manager on the project.

This project provided unique challenges and opportunities - a fragile artifact to build around, a flexible warehouse intended to host a variety of extreme displays, engineering expertise across decades and disciplines, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

31: Spiral Mound | First Americans Museum

Saison 4 · Épisode 31

vendredi 28 octobre 2022Durée 38:29

In this episode, Cherise is joined by William H. Fain, Jr., FAIA, Partner at Johnson Fain. Bill shares insights into his work on the First Americans Museum in Oklahoma City, OK. The building is a 175,000-square-foot museum, including 4,000-square-foot FAM Center; 280-acre campus along the Oklahoma River.

The concept for the museum, which honors 39 tribes in Oklahoma today, is a spiral that begins in the earth and ascends to the heavens. It is composed of two arcs: the western arc featuring permanent and rotating exhibitions and the northern arc that houses theaters, retail, dining, and other services necessary in modern museums. A 110 foot tall prismatic glass structure called the Hall of The People serves as both a starting point for visitors and a central gathering space. Its form is inspired by a Wichita grass lodge, and it features 10 26-inch diameter columns to represent the 10 miles per day that native people were forced to walk during the expulsion from their lands. Three sky terraces ( Moon, Stars) set back within the building envelopes offer views of the Oklahoma River and Downtown Oklahoma City. To see project photos and details discussed, visit arcat.com/podcast

This project provided unique challenges and opportunities - through complexities in funding and politics the project took 25 years to complete, several local construction projects needed to deposit 400,000 cubic yards of red earth which created the spiral mound that became the central element of the master plan, the entire project was designed to align with the cardinal directions and serve as a cosmological clock, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

30: Checkered Concrete Floor | Mountain View High School

Saison 3 · Épisode 30

vendredi 7 octobre 2022Durée 42:19

In this episode, Cherise is joined by Kourtney Strong, AIA, CSI, CDT – Associate Principal from LSW Architects in Vancouver Washington. Kourtney shares insights into her work on the Mountain View High School Replacement in Vancouver, Washington. The design for Mt. View High School’s new 275,000 sf building prioritizes visibility, safety, and student empowerment.

To serve and consider all student needs and teaching/learning modalities, the building includes a rich variety of spatial typologies and environments. The intent is to create learning options that invite and empower students to participate and collaborate with one another and extend this across all spaces. With such a large campus, a key objective was to make the school’s multifaceted learning environments visible and accessible to students. The goal was to build a sense of unity and personalization to the school by breaking its scale down into connected areas. To see project photos and details discussed, visit arcat.com/podcast

Ali Abbaszadegan, Senior Project Manager, AIA, ASLA at R&C Management Group LLC, provides additional insight from the owner's representative and project management perspective.

Trevor Wyckoff, Vice President – Account Manager at Skanska USA Building Inc., shares his expertise to illustrate some of the unique elements that his team executed on the project, including tilt-up concrete walls and a checkered pattern polished concrete floor.

This project provided unique challenges and opportunities - early team integration provided scheduling and coordination benefits, with students actively occupying site construction had added complexity, an early suggestion from the GC to implement tilt up concrete walls provided significant schedule and labor benefits, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

29: Composite Metal Panel | California State University, Fullerton Residence Halls

Saison 3 · Épisode 29

vendredi 30 septembre 2022Durée 46:17

In this episode, Cherise is joined by James Sink, AIA, LEED AP, DBIA, Design Principal and Nicholas Casolari, AIA, Senior Project Manager, both with HMC Architects in Ontario, California. James and Nicholas share their insights into their work on California State University, Fullerton Residence Halls in Fullerton, California. The $99.1 million dollar, 185,505 SF housing project leverages building mass and landscape to create an insulated community to serve 600 sophomores and juniors and provides diverse spaces that will support a wide variety of programmed and unexpected experiences.

While the building functions as a single unit, its exterior massing is read as three distinct wings. Two northern wings and a single southern wing are connected by a bridge at each upper level, acting as a physical and social connector. The bridge and upper-level common spaces overlook an open plaza, a sloped lawn with stepped amphitheater seats to the west, and an intimate courtyard for residents to the east on the ground floor. The design incorporates the school’s colors and an angular motif from hexagonal patterns found on the campus’ mid-century buildings to unite the interior and exterior architecture. To see project photos and details discussed, visit arcat.com/podcast

This project provided unique challenges and opportunities - complexity of public project requirements, a pandemic in the middle of construction impacted the budget through price increases and labor and material supply challenges, a design-build model provided flexibility to make adjustments to project challenges, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy

28: Connector Bridge | Serena Williams Building at Nike World Headquarters

Saison 3 · Épisode 28

vendredi 23 septembre 2022Durée 45:51

In this episode, Cherise is joined by Robin Wilcox and Susan Barnes, two Principals from Skylab Architecture in Portland, Oregon. Robin and Susan share their insights into their work on the Serena Williams Building at Nike World Headquarters in Beaverton, Oregon. At more than 1 million square feet, the building establishes new links to the existing campus through restored wetlands, public plazas, and view corridors.

The architecture was inspired by Nike’s heritage while providing innovative workspaces enabling designers to continue to imagine and deliver the future of sport. Anchored by a ten-story tower, the building marks the epicenter of campus for this visionary company. Serena Williams, the ultimate phenom/warrior/muse, is personified in the building’s narrative via the samurai armor-inspired exterior and abstracted wing of the goddess Nike evident in the tripartite massing. To see project photos and details discussed, visit arcat.com/podcast

This project provided unique challenges and opportunities - a complex tower that cantilevers on one corner provides an open plaza, an innovative 150-foot-long Connector bridge made of a rotational steel truss tube functions as a collaboration space, a 50-foot subterranean parking garage required extensive coordination to develop a column grid that achieved continuous columns from the garage through to retail and office floors above, and much more.

If you enjoy this show, you can find similar content at Gābl Media.

Mentioned in this episode:

ARCATemy


Podcasts Similaires Basées sur le Contenu

Découvrez des podcasts liées à Detailed: An original podcast by ARCAT. Explorez des podcasts avec des thèmes, sujets, et formats similaires. Ces similarités sont calculées grâce à des données tangibles, pas d'extrapolations !
Defining Hospitality
EntreArchitect Podcast with Mark R. LePage
Archispeak
Practice Disrupted by Practice of Architecture
Talking Home Renovations with the House Maven
Spaces Podcast
Hidden in Plain Site
Tangible Remnants
The Modern Hotelier
BUILD SMART with Patrick MacLeamy, FAIA
© My Podcast Data