Free, high-value ARE prep broken into digestible episodes that make studying accessible and actually enjoyable.
We translate complex exam content into clear, actionable strategies based directly on NCARB's objectives—not complicated study approaches that miss the mark.
Young Architect has guided thousands to licensure since 2013 by simplifying ARE prep to what truly matters and keeping it fresh.
Subscribe for practical ARE insights delivered in a format that fits your busy life.
Site
RSS
Apple
Données mises à jour le 16/11/2026
Classements récents
Dernières positions dans les classements Apple Podcasts et Spotify.
Liens partagés entre épisodes et podcasts
Liens présents dans les descriptions d'épisodes et autres podcasts les utilisant également.
OFCI (owner furnished, contractor installed) is one of those procurement methods that sounds simple until coordination breaks down on a real project. In this episode, Emily explains what OFCI means, how it compares to CFCI and OFOI, and why splitting the furnish-and-install responsibility creates real risks for owners, contractors, and architects.
We walk through the most common OFCI items you'll see on construction projects, the coordination challenges that come with owner-furnished materials including quantity estimation errors, delivery timing, trade coordination, chain of custody, and warranty disputes. Then we break down exactly how OFCI gets documented in Division 01 specifications, individual spec sections, drawings, and contracts. If you're studying for the ARE or CDT exam, this episode covers procurement scenarios you need to understand for PcM, PjM, and CE.
📝 Key topics covered:
What OFCI means and how "provide" equals furnish and install in AIA contracts
061 - Owner's Consultants: Know Where Your Liability Ends
Épisode 61
lundi 13 avril 2026 • Durée 24:41
Owner's consultants vs architect's consultants: know the difference before the ARE tests you on it. In this episode, we break down who hires who on a construction project, where the liability falls, and why getting this wrong can cost you your career.
Every project has two teams of consultants. The architect's team designs what's going to be there. The owner's consultants deal with what's already there, the land, the soil, the surveys, the environmental hazards. That distinction sounds simple, but the liability implications run deep.
We break down the existing versus proposed framework, the hard rules about never hiring a geotechnical engineer or surveyor as the architect, and the difference between basic coordination and supplemental coordination services. We also cover why "coordinate" and "manage" mean very different things in contract language, and how AIA B101 handles reasonable reliance on owner-provided information.
📝 Key Topics Covered:
Owner's consultants vs architect's consultants
The existing vs proposed framework for identifying consultant responsibility
Why architects should never hire the geotech, surveyor, or hazmat consultant
Basic coordination vs supplemental coordination
The coordinate vs manage vocabulary distinction
AIA B101 reasonable reliance on owner-provided information
Professional liability insurance exclusions for ground conditions
How this shows up on PcM, PjM, and CE exams
⏱️ Chapters:
(0:00) Introduction
(2:47) Two Types of Consultants
(17:24) Owner's Responsibility for Existing Conditions
(20:33) How This Shows Up on the Exam
(22:41) Wrap-Up
060 - How to Become an Architect: What You Need to Know
Épisode 60
lundi 6 avril 2026 • Durée 20:11
How to become an architect in the US comes down to four steps: education, experience, exams, and fees. In this episode, Michael Riscica breaks down the full path to getting your architecture license, from choosing the right degree to passing all six ARE exams.
Most people think architects sit at a drafting table sketching buildings all day. The reality is that design is maybe five to ten percent of the job. The rest is construction documents, code reviews, cost estimates, project management, and client meetings.
We start with what architects actually do on a daily basis, then get into how long the whole process takes. We cover why architecture is a regulated profession, why not everyone who studies architecture needs to become licensed, and then walk through each of the four licensing steps in detail.
📝 Key topics covered:
What architects actually do every day
How long it takes to become a licensed architect
Why you cannot legally call yourself an architect without a license
The four requirements: education, experience, exams, and fees
Why architecture degrees open doors beyond licensure
The ARE exam process and what to expect
⏱️ Chapters:
(0:00) Introduction
(2:00) What Architects Actually Do
(4:09) Is It Hard to Become an Architect
(5:54) How Long Does It Take
(10:41) Architecture Is a Regulated Profession
(13:57) Architecture Is Bigger Than Buildings
(16:34) 4 Steps to Getting Licensed
(18:46) Wrap Up
📖 Read the full blog post:
059 - PA, PPD, and PDD: Know the Difference Before You Study
Épisode 59
lundi 23 mars 2026 • Durée 25:47
PA, PPD, and PDD share the same topics but test them from completely different perspectives. Understanding the difference between these three technical ARE exams before you start studying will save you serious time and frustration.
In this episode, Layla breaks down what each exam actually covers, how they connect to each other, and why so many candidates study the wrong things for the wrong test.
She walks through the "Define It, Design It, Document It" framework that shows how PA, PPD, and PDD follow the natural progression of a building project from pre-design through construction documents. Plus study strategies for the technical exams and a homework assignment to help you take this deeper.
📖 Key Topics Covered:
Why candidates confuse PA, PPD, and PDD content
The "Define It, Design It, Document It" framework
How PA covers the pre-design and programming phase
How PPD covers schematic design and system selection
How PDD covers detailing, documentation, and specifications
Where codes, site, and building systems overlap across all three
The wall assembly test for sorting topics by exam
Study strategies including exam sequencing and when to move on from PA
⏱️ Chapters:
(0:00) Introduction
(4:16) Why These Exams Are So Confusing
(5:47) The Flip the Words Trick
(7:01) One Project Three Phases
(8:39) PA Programming and Analysis
(11:44) PPD Project Planning and Design
(13:59) PDD Project Development and Documentation
(16:32) How They Flow Together
058 - Division 01 General Requirements: Running Your Project
Épisode 58
lundi 16 mars 2026 • Durée 22:51
Division 01 General Requirements is the most skipped section in the project manual. Here's what's actually inside and why every division depends on it.
Division 01 is the rulebook that governs every trade on a construction project, and almost nobody reads it. We start by clearing up the number one confusion in specifications: the difference between General Conditions and General Requirements. They're both Contract Documents, but they do very different things. Then we walk through every major section from Summary (01 10 00) to Commissioning (01 91 00).
Whether you're studying for the ARE, preparing for the CDT or CCCA, or just trying to write better specs, this episode gives you the full picture of why Division 01 is the global settings for your entire project.
📝 Key topics covered:
General conditions vs general requirements: rights vs rules
Price and payment procedures vs the actual agreement
Submittal processes and administrative requirements
Quality requirements, testing, and who pays for what
Substitution procedures during bidding vs construction
Execution, closeout, and commissioning in construction
055 - Control Joint vs Expansion Joint: Where the Cracks At?
Épisode 55
lundi 23 février 2026 • Durée 28:49
Control joint vs expansion joint is one of those topics that trips people up because the terms sound so similar. This episode breaks down all four joint types you need to know for the ARE and the job site.
We cover expansion joints, control joints, isolation joints, and construction joints. For each one, we explain what it does, where you'll see it in real construction, and how to remember the difference on exam day.
We also give you the rebar test for telling isolation and construction joints apart, plus clear analogies so you're not just memorizing definitions.
📝 Key topics covered:
Expansion joints and how they allow material movement
Control joints and why you plan for cracks instead of preventing them
Isolation joints and when complete separation is required
Construction joints and how they relate to the work schedule
The rebar test for telling isolation and construction joints apart
054 - PcM, PjM, and CE: Understanding the Difference Before You Study
Épisode 54
lundi 16 février 2026 • Durée 23:07
PcM, PjM, and CE are three different exams, but most people study them without understanding what makes each one unique.
This episode breaks down exactly what NCARB is testing on Practice Management, Project Management, and Construction and Evaluation so you can study smarter, not harder. Too many ARE candidates jump into prep materials without ever looking at what each exam actually focuses on, and that leads to wasted time and confusion.
PcM zooms out to the firm level. It's about business operations, finances, risk, and how an architecture practice stays profitable.
PjM zooms into one project. You've got a signed contract, a team, and a schedule to manage through the design phases.
CE picks up after the documents are done and construction begins. It's about administering the construction contract and making sure what gets built matches what was designed.
We also cover where these exams overlap (contracts, risk, insurance, quality control, and project delivery methods all show up on all three), and why that overlap is actually good news for your study plan. Plus, there's a free homework assignment that ties it all together.
6:30 - The Big Picture: What Ties These Three Exams Together
8:17 - PcM: Practice Management - Running the Firm
9:57 - PjM: Project Management - Managing the Project
12:13 - CE: Construction and Evaluation - On the Job Site
053 - Concrete Slab Types: A Guide to Structural Systems
Épisode 53
lundi 9 février 2026 • Durée 21:38
Six concrete slab types explained with span ranges, load capacities, and the decision framework you need to pick the right system every single time.
Every concrete slab question on the ARE comes down to two things: the shape of your bay and the loads it needs to carry. But with six different systems to choose from, it's easy to second-guess yourself when the clock is ticking.
In this episode, we break down all six structural slab systems from one-way solid slabs to waffle slabs.
You'll learn the span ranges for each, the load conditions that drive your selection, and the visual cues that show up in exam questions.
We cover why bay geometry matters more than anything else, how to tell the difference between a one-way joist and a waffle slab, and what punching shear has to do with flat plates vs flat slabs.
Key topics covered:
- One-way vs two-way classification using the aspect ratio test
- Two-way slab with beams for square bays (15-40 ft)
- Flat plate vs flat slab: when drop panels matter
- Waffle slabs for long spans and architectural expression (24-54 ft)
- Formwork cost comparison across all six systems
- A quick decision framework for exam day
This content is especially relevant for the PPD and PDD divisions of the ARE 5.0.
Chapters:
0:00 - Introduction
2:10 - One-Way vs Two-Way: The Shape Test
4:45 - One-Way Slab
6:02 - One-Way Joist Slab
052 - Cast-in-Place Concrete: From Spans to Slump Tests
Épisode 52
lundi 26 janvier 2026 • Durée 29:58
Cast in place concrete spans, rebar sizing, slump tests, and when to reject a pour. Everything you need for PPD, PDD, CE, and PA exam questions.
Understanding cast in place concrete is essential for multiple ARE divisions. This episode breaks down how concrete and rebar work together as a structural system, why span limitations matter for your architectural design, and what you need to know for construction observation questions.
We cover the key concepts that show up on PPD when selecting structural systems, PDD when detailing and sizing components, CE when identifying non-conforming work, and PA when evaluating existing buildings. You'll learn typical span ranges for standard cast in place concrete (20-25 feet), how rebar sizing works in 1/8 inch increments, and why concrete excels in hurricane zones but presents challenges in seismic areas.
Key topics covered:
Concrete vs. rebar responsibilities (compression vs. tension)
One-way slabs versus two-way slabs
Honeycombing, spalling, and 45-degree shear cracks
Slump tests and Kelly Ball tests
CMU block versus cast in place concrete
Pre-tensioned vs. post-tensioned systems
Chapters:
0:00 - Introduction
4:26 - When to Choose Concrete
7:26 - How Concrete Works
11:19 - Common Mistakes with Concrete
13:49 - Construction Observation
17:39 - Identifying Structural Failures
19:27 - CMU Block vs Cast-In-Place
21:57 - Pre-Tensioned and Post-Tensioned
26:14 - How to Use This on Exam Day
28:43 - Wrap Up
051 - What is an RFI in Construction? Everything You Need to Know
Épisode 51
lundi 12 janvier 2026 • Durée 21:03
An RFI in construction is the formal way to get answers when something in the contract documents is unclear, missing, or conflicting. In this episode, we break down the full RFI meaning, the RFI process, when to use them, when NOT to use them, and the critical differences between RFIs and every other construction administration document.
On a large project, you might see 500 to 1,000 RFIs before construction wraps up. That's 500 to 1,000 opportunities for miscommunication, delays, and finger-pointing if they're not handled properly. You'll learn why an RFI should be the "nuclear option" for getting answers, not your first step. We cover what makes a good RFI versus what I call a "Zombie RFI" that creates more problems than it solves, how the architect should respond, what happens when RFIs go unanswered, and how all of this shows up on the ARE exam.
Whether you're preparing for the Construction and Evaluation exam or just trying to understand how construction administration actually works in practice, this episode gives you everything you need to know about RFIs in one place.
📝 Key topics covered:
RFI meaning and definition (Request for Information)
The complete RFI process from start to finish
When to use an RFI vs when NOT to use one
RFI vs submittal vs ASI vs change order vs CCD
What makes a good RFI vs a "Zombie RFI"
The architect's responsibilities, response times, and liability
As Emily mentions, understanding technical concepts like cast in place concrete becomes much clearer when you can discuss them with other candidates and get expert guidance.
👍 Like this episode? Subscribe for weekly architecture and ARE exam prep!
Découvrez des podcasts liées à Architect Exam Podcast. Explorez des podcasts avec des thèmes, sujets, et formats similaires. Ces similarités sont calculées grâce à des données tangibles, pas d'extrapolations !